: AI that connects field recordsall the way to reporting

It sees, hears, and understands the jobsite to complete the records and documents you need.

  • Smart Glasses
  • On-Device AI
  • Safety & Risk AI
  • Auto Documentation
Certified Venture Company
KICT Korea Institute of Civil Engineering and Building Technology
2026 Korea Residential Environment Award

2026Global Accelerating Program(GMEP)Selected

Through an accelerating program led by KAIA, we're knocking on the door of European construction sites.

Learn more

2026Startup Growth Technology Development Program(Didimdol)Phase 3 PlanSelected

Even with gloves on, even where connectivity drops on site — we're building AI that records by voice alone.

Learn more

2026Global Accelerating Program(GMEP)Selected

Through an accelerating program led by KAIA, we're knocking on the door of European construction sites.

Learn more

The later field records arrive,situation awareness and safety response fall behind with them.

  1. Issue occursWork or inspection issue arises
  2. Records scatterPaper, Excel, photos, messengers
  3. Late collationManual cleanup after hours
  4. Delayed responseSlow awareness and evidence
A site manager entering records from stacks of paper documents in an office

Scattered data

Records spread across tools, so field status is understood too late.


  • Checklists, reports, and photos split across paper/Excel/messengers
  • No real-time sharing between site and head office
  • Evidence re-collected after an incident
A worker checking records on a phone at a tunnel construction site

Hands-free bottleneck

When input is blocked, records are delayed and missed.


  • Phone input is impractical in helmets or at height
  • Underground and tunnel dead zones limit use
  • Fewer reports leads to gaps and higher incident risk

It sees, hears, and understandsthe site, then completes the records and work for you.

Field touchpoints

Hands-free capture of field data

  • Smart glasses deviceSmart glasses
  • Mobile deviceMobile device

  • Worker voice, site conversation
  • Photos, video, CCTV
  • Drawings, BOQ, checklists
  • Work location, time, owner
  • Construction and defect history

Field AI

Recognize data → judge site context → run work functions

  • On-device AIInterprets voice on-device Works offline, unstable connectivity
  • VLM · OCRReads photos, drawings, documents Structures equipment, trade, hazard, action
  • AI copilotAnalyzes regulations, drawings, records Suggests content, supports decisions

Automation and integration


Document automation

  • Automated daily work logs
  • Construction and defect records
  • Safety inspections and risk checks
  • Preparation and evidence reports
  • Supervision logs and approvals

Field operations

  • Schedule, workforce, safety dashboards
  • Hazard and omission alerts
  • Drawing-anchored history
  • Real-time sharing with partners
  • ERP and system integration
  • Evidence for audits, disputes

Project drawing management

Drawing versions and change tracking, plus location-tagged construction records, defect handling, and messaging in one place.

  1. 1Change history-Version tracking keeps everyone on the same drawing
  2. 2Location tags-Location-based records and defect-repair requests
  3. 3Page markers-Jump straight to the page for that area
42
Project management
Log out

Projects / Project management / Drawings

DP Apartment Building 101 Active

Manage

101_typical-floor_structural-plan.pdf

Versions
Typical floor structural plan for Building 1012/3Try clicking a location tag.
  • Basement 1 plan
  • Level 1 plan
  • Level 3 typical plan

Safety inspection checklist

Inspect hazards and raise transparency with electronic signatures and real-time photos.

  1. 1Item checks-Results structured as pass / fail / not applicable
  2. 2Field photos-Real-time capture for verifiable evidence
  3. 3Electronic signature-Signature history strengthens accountability
11
Project management
Log out

Projects / Project management / Assigned inspections / New inspection

Add a safety inspection assignment.

Week 1 February daily inspection (L3 frame) Assigned

Cancel
Assignment details
Inspection form
Daily safety checklist (frame work)
Assigned
2026-08-14

Inspection entry

Review each item and select the matching result.

Personal protective equipment

Helmet, safety boots, and harness worn

Try choosing an inspection result.

Toolbox meeting completed for new workers

Work at height and fall prevention

Working platforms and guardrails properly installed

Openings and edges covered and protected

Construction records

Location and time metadata prevents undocumented work, and AI photo analysis drafts the record for you.

  1. 1On-site capture-Location and time recorded with every photo
  2. 2AI-written content-A record draft written from the photos (LLM)
12
Project management
Log out

Projects / Project management / Drawings / Records / New record

Add a construction record to the project.

DP Apartment Building 101 / Level 3, zone B-04 / 3F rebar placement

  1. 1Record photos
  2. 2Record details
Record photos

Choose the work type and upload the record photos.

Try choosing a work status.Work status

Drag files here, or choose them directly.

(Supported: pdf, jpg)

Defect repair requests

Location and time metadata makes the target unambiguous, and approval history is tracked for you.

  1. 1Defect location-Photo, location, and time pin down the target
  2. 2Approval process-Every approval step recorded automatically
  3. 3AI-written content-A request draft written from the defect photos
12
Project management
Log out

Projects / Project management / Drawings / Repair requests / New request

Add a defect repair request to the project.

DP Apartment Building 101 / Level 3, zone B-04 / 3F rebar placement

  1. 1Request photos
  2. 2Request details
Request photos

Upload photos of the defect.

Drag files here, or choose them directly.

(Supported: pdf, jpg)

Try clicking Choose file.

Field messenger

Talk in a channel dedicated to the project, share locations on the drawing, and circulate TBM notes for accurate collaboration.

  1. 1Channel collaboration-A dedicated channel per project
  2. 2AI-written TBM notes-Drafted from the day's work and weather
  3. 3Drawing location messages-Messages carry a location tag
12
DashboardNotificationsField TalkTo doAttendance
Log out

Chat rooms / Chat room

Talk with the people on this project.

DP Apartment Building 101 Active

SearchMenu
J. HongShowers are forecast this afternoon — let us wrap up the work at height early.12:00 PM
Try clicking the + button.Type a message.

Automated daily work reports

AI analyses field records and uploaded documents to generate and fill in daily report entries, then routes them through a transparent approval flow.

  1. 1AI-generated drafts-Automatic analysis and extraction from accumulated field data
  2. 2Review and approval-Connected to your reporting and approval workflow
42
Project management
Log out

Projects / Project management / Daily reports / New daily report

Write and add a daily work report for the project.

Try selecting a trade.Trade
Cancel Save draft
Report name
OwnerChecked by
J. LimG. Hong

Upload a file to generate the daily report automatically.

(Supported: xlsx, docx, xls, doc, pdf, hwp, hwpx)

Choose file
1. Work summary
ProjectDP Smart Tower new constructionDate2026.05.31WeatherRain, 29°C, 60% chance
Today's workEnter today's work.Tomorrow's workEnter tomorrow's work.
2. Labour deployed
PreviousEnter previous headcount.TodayEnter today's headcount.CumulativeEnter cumulative headcount.
3. Materials used
ItemEnter the item name.QuantityPreviousEnter previous quantity.
SpecEnter the spec.TodayEnter today's quantity.
UnitEnter the unit.CumulativeEnter cumulative quantity.

Add material

4. Equipment deployed
EquipmentEnter the equipment name.PreviousEnter previous count.Work performedEnter the work performed.
SpecEnter the spec.TodayEnter today's count.
CumulativeEnter cumulative count.

Add equipment

5. Remarks
RemarksEnter any remarks.

Schedule and cash-flow board

Visualise cash flow from your document data and manage the whole site at a glance with a trade / process / task schedule.

  1. 1Hierarchical scheduling-A schedule structured by trade, process and task
  2. 2Cash flow at a glance-Financial status as intuitive indicators
  3. 3One unified view-From notices through to outstanding work
42
  • Dashboard
  • Notifications
  • SigongTalk
  • To do
  • Attendance
Log out
Dashboard

Manage your organisation and project status at a glance.

Attendance
Records
2026-08-14 (Mon) 09:14:26Not clocked in
Clock in
Clock out
Clock inClock out
Notice board
View all

No posts yet.

1/1

Select project
Try selecting a project.Select project
Schedule

No data to display. Select a project first.

Cash flow

No data to display. Select a project first.

No data to display. Select a project first.

No data to display. Select a project first.

No data to display. Select a project first.

AI Copilot

Regulations, drawings and field data in one place, supporting both safety and daily work.

Selecting a crack on a site drawing while AI presents similar cases, related regulations and a risk grade
  1. Before work

    Safety preparation

    • Drafts TBM and risk assessments
    • Surfaces the relevant standards and checks
  2. During work

    On-site decision support

    • Looks up drawing locations and past history
    • Suggests likely causes and remedies
  3. After work

    Automated records and reports

    • Drafts daily reports and field records
    • Generates reports and supporting documents

The evidence behind every answer

  • Official standards

    Building code · safety standards · standard specifications

  • Drawings and contracts

    Drawings · bills of quantities · schedules

  • Field records

    Photos · voice notes · daily reports · defect history

  • Past history

    Construction · inspection · remedial and approval records

Sites differ, but the problems of
recording, inspection, reporting and evidence are the same.

  • Plant

    Piping and equipment inspection

  • Facility management

    Defects · complaints · inspection history

  • Fire safety and MEP

    Statutory inspection reports

  • Telecom

    Base station and fibre inspection

Unified field records and documents

Photos · voice · drawings · checklists


Capture → organise by item → link location and history → automate documents

  • Building

    Structure and finishing records

  • Civil works

    Road and bridge photo logs

  • Safety and supervision

    Checklists · inspection requests

  • Public facilities

    Landscape and playground inspection

  • Energy

    Solar and power equipment evidence

Results

Records are automated, reports are faster,
and risks are managed earlier

  • 80%

    Less time spent writing records and reports

  • 70%

    Less duplicate entry and manual cleanup

  • 60%

    Faster document and evidence preparation

  • Same day

    Draft reports from field records

From site diagnosis to setup and training,
we help teams apply it quickly through dedicated step-by-step support.

  1. Site diagnosis

    Workflow and data analysis

    Review current records and reports Define scope and key goals

    Scope defined
  2. PoC · scope

    Validation with real data

    Test automated photo and voice records Confirm rollout scope and schedule

    Validated
  3. Setup

    Site-specific configuration

    Configure accounts, roles, and forms Structure drawings and existing data

    One-time setup
  4. Training · launch

    User adoption support

    Train admins, managers, and partners Monitor early operations and respond

    Operations live

Equip field experience with data.

Build a smarter jobsite with RENAME DP.